[1]
A. A. Hameed and F. M. S. Al-Zwainy, “Diagnose the Variables Affecting the Estimation of Completion Time of Engineering Projects using Intelligence Neural Network Models”, JESIT, vol. 6, no. 5, pp. 1–24, Sep. 2022, doi: 10.26389/AJSRP.B110622.